| S.N. | Main Contractor | Name of the Work | Value of the Work in Crores | Status |
|---|---|---|---|---|
| 1. | Kaluwala Construction PVT Ltd | Construction o 1 ROB & 3 Flyovers of National Highway No. 730 at the section from km 133+230 to km 134+330, km 134+550 to km 135+650, km 136+200 to 137 +800 in the state of Uttar Pradesh :- Regarding Structure and Drainage work | 35.00 | Completed |
| 2. | Kaluwala Construction PVT Ltd | Construction of 4 Lane Elevated corridors from near Madiaon to IIM Crossing (km 486.285 to km 488.231) on Lucknow- Sitapur Section of NH-24 on EPC Mode:-Regarding Structure and Drainage work | 10.00 | Completed |
| 3. | DHARIWAL Buildtech Limited | Construction of four lane road from Km 5+800 of R’Block Digha Road (Phase -I) to Km 7+100 connecting Ganga Path Rotary Leg at Ch 0+200 including Flyover /Under pass /Slope & Toe Wall Protection /RE Wall etc at Patna in State Of Bihar on EPC Mode. | 2.05 | Completed |
| 4. | DHARIWAL Buildtech Limited | Four Laning of Rajauli - Bakhtiyarpur Section of NH- 31 (New NH-20) From Km 101+630 to Km to Km 152+ 520 (Package III) (Desing Length 50.890 KM) in the state of Bihar on Hybrid annuity Mode | 3.55 | Completed |
| 5. | Sri Balajee Entepriese | Construction 8 Lanes Rehabilitation & Up- gradation of Lahimpur-sisiya Section of NH-730 (KM 82.000 to 140.000)to Two Lane with Paved Shoulder under EPC Mode in the State of Uttar Pradesh” | 6.00 | Completed |
| 6. | Sri Balajee Entepriese | Construction 8 Lanes Rehabilitation & Up- gradation of Lahimpur-sisiya Section of NH-730 (KM 140.000 to 188.000)to Two Lane with Paved Shoulder under EPC Mode in the State of Uttar Pradesh” | 6.00 | Completed |
| 7. | Patel Infrastructure Limited | Development of “Ganga Expressway” (Group-III) an Access-Controlled Six lane (Expandable to Eight Lane) Greenfield Expressway from Meerut to Prayagraj from Km. 289+300 to Km. 445+000 (total design length- 155.700 Km) in the state of Uttar Pradesh on DBFOT (Toll) basis. | 250 | 90% work Completed |
| 8. | DHARIWAL Buildtech Limited | Design and Construction of 26 Nos. Vehiculaar Underpasses and 4Nos. Service Road, Installation of Metal Beam Crash Barrier (for the package C-3, C-4, C-5, C-6, C-7, C-8 AND C-9) & Demolition and Re-construction of Distressed Bridge at CH. 402+987 (LHS) on Lalitpur Sagar Lakhnadone from Km. 99.005 to Km. 415.089 Section of NH-44 in the state of Uttar Pradesh and Madhya Pradesh on EPC mode | 40.00 | Completed |
| 9. | Apco Infratech Private Limited | Work order for Construction of various structures at WTP in all respects, in Project Mathura Pkg I at Mathura in the State of Uttar Pradesh. | 33.00 | Completed |
| 10. | NHIT Southern Projects Private Limited | Repair and Rehabilitation of Shoulder works using the milling material on Four-lane of Bareilly-Sitapur Road section. | 1.07 | In-Process |
| 11. | NHIT Southern Projects Private Limited | Removal and Disposal of Excess Soil from Median from the project site along Bareily Sitapur section of NH-30 in the state of Uttar Pardesh. | 0.27 | In-Process |
| 12. | Patel Infrastructure Ltd(PIL) | Ganga Expressway for Construction of Way side Amenities Building at KM 423+900. | 4.30 | Completed |
| 13. | Surya Construction Company | Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bewar - Allahganj Section (KM 0.000 to KM 52.770) of NH - 730C in the State of Uttar Pradesh under Green National Highways Corridor Project (GNHCP) on EPC mode. | 1.00 | Completed |
| 14. | Kaluwala Construction Pvt. Ltd. | Kaluwala Construction Pvt. Ltd has been awarded the work of "Construction of Four Lane at existing road section of NH-30 (Old NH-24B) from km 82.650 to 83.880 (length-1.150 km), 84.635 to 98.750 (length-14.290 km), 103.660 to 107.260 (length-3.6 km), 111.390 to 115.425 (length-4.025 km), 124.345 to 130.445 (length-6.050 km), 133.155 to 161.450 (length- 27.9 km) and Link road from 161.450 to 641.350 (length-6.156 km) of NH-2 for Raebareli to Prayagraj section in the State of Uttar Pradesh (Total length-63.171 km)" on EPC Mode. | 2.1 | Completed |
| 15. | Zetwerk Maximize Manufacturing |
Rehabilitation & Upgradation of Kurwai–Mungaoli–Chanderi Road section of NH-346, from Design Chainge 0.000 to 81.300 Km (Total length 81.3 km) to Two lanes with paved shoulder configuration along with One-time improvement in 07 nos of bypassed built-up areas in a total length of 22.615 km in the state of Madhya Pradesh on EPC mode.
Erection Of Pannel with All Accessories and Casting And Erection of Pannel with All Accessories. |
2.42 | Completed |
| 16. | Dhariwal Buildtech Limited | Four Lane Highway from Chandan Nagar (Existing Km96.200 of NH 530B/Design Km. 179.500) to Bareilly Bypass (Start) (Existing Km. 59.025 of NH 530B/ Design Km. 218.000) section of NH 530B,in the State of UĴar Pradesh on HAM mode under NH(O) scheme. | 40.50 | In-Process 30% |