1. Kaluwala Construction PVT Ltd Construction o 1 ROB & 3 Flyovers of National Highway No. 730 at the section from km 133+230 to km 134+330, km 134+550 to km 135+650, km 136+200 to 137 +800 in the state of Uttar Pradesh :- Regarding Structure and Drainage work 35.00 Completed
2. Kaluwala Construction PVT Ltd Construction of 4 Lane Elevated corridors from near Madiaon to IIM Crossing (km 486.285 to km 488.231) on Lucknow- Sitapur Section of NH-24 on EPC Mode:-Regarding Structure and Drainage work 10.00 Completed
3. DHARIWAL Buildtech Limited Construction of four lane road from Km 5+800 of R’Block Digha Road (Phase -I) to Km 7+100 connecting Ganga Path Rotary Leg at Ch 0+200 including Flyover /Under pass /Slope & Toe Wall Protection /RE Wall etc at Patna in State Of Bihar on EPC Mode. 2.05 Completed
4. DHARIWAL Buildtech Limited Four Laning of Rajauli - Bakhtiyarpur Section of NH- 31 (New NH-20) From Km 101+630 to Km to Km 152+ 520 (Package III) (Desing Length 50.890 KM) in the state of Bihar on Hybrid annuity Mode 3.55 Completed
5. Sri Balajee Entepriese Construction 8 Lanes Rehabilitation & Up- gradation of Lahimpur-sisiya Section of NH-730 (KM 82.000 to 140.000)to Two Lane with Paved Shoulder under EPC Mode in the State of Uttar Pradesh” 6.00 Completed
6. Sri Balajee Entepriese Construction 8 Lanes Rehabilitation & Up- gradation of Lahimpur-sisiya Section of NH-730 (KM 140.000 to 188.000)to Two Lane with Paved Shoulder under EPC Mode in the State of Uttar Pradesh” 6.00 Completed
7. Patel Infrastructure Limited Development of “Ganga Expressway” (Group-III) an Access-Controlled Six lane (Expandable to Eight Lane) Greenfield Expressway from Meerut to Prayagraj from Km. 289+300 to Km. 445+000 (total design length- 155.700 Km) in the state of Uttar Pradesh on DBFOT (Toll) basis. 250 90% work Completed
8. DHARIWAL Buildtech Limited Design and Construction of 26 Nos. Vehiculaar Underpasses and 4Nos. Service Road, Installation of Metal Beam Crash Barrier (for the package C-3, C-4, C-5, C-6, C-7, C-8 AND C-9) & Demolition and Re-construction of Distressed Bridge at CH. 402+987 (LHS) on Lalitpur Sagar Lakhnadone from Km. 99.005 to Km. 415.089 Section of NH-44 in the state of Uttar Pradesh and Madhya Pradesh on EPC mode 40.00 Completed
9. Apco Infratech Private Limited Work order for Construction of various structures at WTP in all respects, in Project Mathura Pkg I at Mathura in the State of Uttar Pradesh. 33.00 Completed
10. NHIT Southern Projects Private Limited Repair and Rehabilitation of Shoulder works using the milling material on Four-lane of Bareilly-Sitapur Road section. 1.07 In-Process
11. NHIT Southern Projects Private Limited Removal and Disposal of Excess Soil from Median from the project site along Bareily Sitapur section of NH-30 in the state of Uttar Pardesh. 0.27 In-Process
12. Patel Infrastructure Ltd(PIL) Ganga Expressway for Construction of Way side Amenities Building at KM 423+900. 4.30 Completed
13. Surya Construction Company Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bewar - Allahganj Section (KM 0.000 to KM 52.770) of NH - 730C in the State of Uttar Pradesh under Green National Highways Corridor Project (GNHCP) on EPC mode. 1.00 Completed
14. Kaluwala Construction Pvt. Ltd. Kaluwala Construction Pvt. Ltd has been awarded the work of "Construction of Four Lane at existing road section of NH-30 (Old NH-24B) from km 82.650 to 83.880 (length-1.150 km), 84.635 to 98.750 (length-14.290 km), 103.660 to 107.260 (length-3.6 km), 111.390 to 115.425 (length-4.025 km), 124.345 to 130.445 (length-6.050 km), 133.155 to 161.450 (length- 27.9 km) and Link road from 161.450 to 641.350 (length-6.156 km) of NH-2 for Raebareli to Prayagraj section in the State of Uttar Pradesh (Total length-63.171 km)" on EPC Mode. 2.1 Completed
15. Zetwerk Maximize Manufacturing Rehabilitation & Upgradation of Kurwai–Mungaoli–Chanderi Road section of NH-346, from Design Chainge 0.000 to 81.300 Km (Total length 81.3 km) to Two lanes with paved shoulder configuration along with One-time improvement in 07 nos of bypassed built-up areas in a total length of 22.615 km in the state of Madhya Pradesh on EPC mode.
Erection Of Pannel with All Accessories and Casting And Erection of Pannel with All Accessories.
2.42 Completed
16. Dhariwal Buildtech Limited Four Lane Highway from Chandan Nagar (Existing Km96.200 of NH 530B/Design Km. 179.500) to Bareilly Bypass (Start) (Existing Km. 59.025 of NH 530B/ Design Km. 218.000) section of NH 530B,in the State of UĴar Pradesh on HAM mode under NH(O) scheme. 40.50 In-Process 30%